Skip to content
Pro Elite Builders
Bathroom and laundry room remodel near Sinking Spring, PA with a tiled shower, washer and green vanity

Bathroom and Laundry Room Remodel near Sinking Spring, PA

A laundry room gains a tiled shower and a vanity, and the old floors next to it come up down to the planks.

The job

What Pro Elite Builders did near Sinking Spring

On October 21, 2026 this was a laundry room stripped for work: pink walls, a band of mosaic tile, washer hookups and a bare floor. Three weeks later the same room has a tiled shower behind glass doors, a green vanity with a white top, a washer and a new plank floor.

In the kitchen and hall next to it, Pro Elite Builders took up the old flooring layer by layer, down to the original plank subfloor. In the November 12 photos the bathroom walls are patched with joint compound and waiting for paint. The same day we photographed a new membrane on the low-slope roof of the garage.

More about bathroom remodeling
Work
Laundry room rebuilt with a shower and vanity, old floors removed, garage roof membrane
Location
Near Sinking Spring, PA · Berks County
Building
Stone-faced home with plank subfloors
Date
November 2026
Stage
Fixtures in, paint to follow
Contractor
Pro Elite Builders, PA HIC #PA215210
Tiled shower with sliding glass doors beside a front-load washer and a green vanityNear Sinking Spring · November 2026

Worth a closer look

One room for the shower and the laundry

A washer needs hot and cold water, a drain and a floor that can get wet. A shower needs the same. Putting both in one room uses plumbing the house already has.

The shower sits behind a new partition wall, with white tile, a dark accent band and sliding glass doors. The washer stands between the shower and the vanity.

The purple board beside the shower is moisture-resistant drywall. The white patches around the room are joint compound over the old pink paint. Primer and paint come next.

Photo log

The remodel in photos, October 21 to November 12

Every photo was taken on this Pro Elite Builders job.

  1. Laundry room stripped for a remodel, with washer valves, a drain pipe and a band of mosaic tile on the wall

    01October 21: the room stripped

    The laundry room with its fixtures out. The washer valves and the drain pipe are still on the wall, and the old flooring is coming up.

  2. Kitchen floor stripped to the original plank subfloor beside white cabinets

    02October 22: the kitchen floor

    With the old flooring gone, the kitchen is down to its original plank subfloor. A floor register opening sits near the wall.

  3. Old flooring layers broken up over a plank subfloor in a hallway

    03Layers in the hall

    In the hall the old floor came up in pieces: underlayment panels and a black layer under them, on top of the same planks.

  4. The remodeled room with a glass-door shower, washer, vanity and plank floor

    04November 12: shower, washer and vanity

    The same room three weeks later, with a tiled shower, a washer, a vanity and a plank floor. The walls are patched and waiting for paint.

  5. New roofing membrane on a low-slope garage roof beside a stone-faced house

    05The garage roof

    On the same property, the garage's low-slope roof has a new membrane, with metal flashing where it meets the wall of the house.

Bathroom remodeling

Adding a shower to a laundry room: what to check first

What a contractor should look at before quoting it.

  • Drain and vent

    A shower drains at floor level, so its trap sits under the floor. The plumber has to find a path from there to the existing drain line with enough slope, and a vent to go with it. Check this before the layout is final.

  • The subfloor

    Old floors are often several layers deep. Taking them up shows the subfloor, and that is the time to fix soft boards and squeaks. New tile or plank flooring needs a flat, stiff base.

  • Wet walls

    Shower walls need waterproof backing behind the tile. The other walls in a room with a shower and a washer do better with moisture-resistant drywall than with the standard kind.

  • Permits

    New flooring, paint and a vanity swapped in the same spot usually need no permit under Pennsylvania's code. A new shower means new drain, vent and supply piping, and that does. Your municipality can ask for more.

Scope

What this job included

  • Laundry room stripped to bare walls and floor
  • Tiled shower with sliding glass doors
  • New vanity, top and faucet
  • Washer set beside the shower
  • New plank flooring in the bathroom
  • Walls patched for paint
  • Old flooring removed to the plank subfloor in the kitchen and hall
  • New membrane on the low-slope garage roof

This list covers what our photos show. Your written proposal lists the full scope for your own job.

Reviews

What customers say about our bathroom remodeling work

5.0All reviews on Google
  • “Amazing job got my bathroom done in about 2 weeks really recommend”

    Shiftline MotorsportsBathroom , Google review
  • “Thanks Viktor and Roman, great job. The grading on my slope was done to my satisfaction. You paid attention to detail and made sure I was kept informed on the progress.”

    Barbara K.Yard grading , Google review
  • “Pro Elite Builder’s did an outstanding job from start to finish. Their team was professional, reliable, and paid great attention to detail. The work was completed on time and exceeded my expectations. I highly recommend them to anyone looking for quality construction and excellent service.”

    Ruvim F.Construction , Thumbtack review

Questions

Bathroom and laundry room remodel: questions homeowners ask

Can a laundry room be turned into a bathroom?

Often, yes. A laundry room already has hot and cold water and a drain. The questions are where a shower drain and vent can run, and how the room is laid out around the washer. This room near Sinking Spring now holds a shower, a vanity and a washer.

How long does a bathroom remodel take?

Going by the dates on our photos, this room went from stripped on October 21, 2026 to fixtures in place on November 12, with paint still to come. Tile, plumbing changes and inspections all move that number.

Does old flooring have to come out before new flooring goes in?

New flooring can go over one sound, flat layer. Several old layers raise the floor, hide soft spots and cause trouble at doors and appliances. In this house we took everything up to the plank subfloor.

What flooring works in a bathroom or laundry room?

Porcelain tile and waterproof vinyl plank both handle water. Hardwood and standard laminate do not belong beside a shower or a washer. The floor under any of them has to be flat and stiff.

Do I need a permit to remodel a bathroom in Pennsylvania?

Tile, flooring, paint and a vanity or toilet swapped in the same spot usually need none under the state code. Adding a shower means new drain, vent and supply piping, and that needs a permit. A municipality can require one where the state does not, so we check for your address.

Do you remodel bathrooms in Lancaster County?

Yes. Most of our work is in Lancaster County. This job is near Sinking Spring in Berks County, which we serve too.

More work

Other Pro Elite Builders projects

Free estimate

Have a project in mind? We'll come out and look at it.

Tell Pro Elite Builders what you need done. We'll call you and come out to look at the job the same day or within 3 days, then send a written proposal with the scope, the price and the schedule.

  • On site the same day or within 3 days
  • Written proposals
  • PA HIC #PA215210

Request a free estimate

  1. 1What do you need?
  2. 2Show us the job
  3. 3How do we reach you?

What do you need?

What do you need? Choose all that apply.

or call us at (610) 858-5650

CallFree estimate