The short answer

Most flooring failures start under the floor. Before any new floor goes down, the subfloor has to pass three tests: it is flat, it is stiff, and it is dry.

Gapping planks, hollow spots, squeaks and cracked grout can nearly always be traced to one of the three. All of them are cheap to fix before the floor goes in and expensive after.

Flat

Flat and level are different things. A floor can slope an inch across a room and still be flat. Flooring cares about humps and dips.

A common tolerance from flooring makers is 3/16 of an inch over 10 feet. Check with a long straightedge laid in several directions, and mark every gap you can slide a coin into. Read the instructions for your product, since some planks are stricter.

  • High spots are sanded or ground down.
  • Low spots are filled with patching compound or a self-leveling underlayment.
  • Seams between sheets of subfloor are sanded flush where one edge stands proud.

Stiff

Tile and grout do not bend. If the floor flexes when someone walks across it, the grout cracks first and the tile follows. The tile industry's standard is that the floor may deflect no more than 1/360 of its span under load, and half that for natural stone.

In practice a bouncy floor gets stiffened before it is tiled: blocking between the joists, a second joist fastened alongside a weak one, or another layer of plywood. Wood and vinyl floors forgive more, though a soft floor still squeaks.

Dry

Wood takes on and gives off moisture until it matches its surroundings. Hardwood nailed to a subfloor that is wetter than the boards will cup. Flooring glued to damp concrete lets go.

  • Wood subfloors are checked with a moisture meter, and so is the new hardwood. The two readings should be within a few points of each other before installation.
  • Concrete slabs are tested for moisture coming up through them. Tape and a guess are not a test. Flooring makers name the test they accept.
  • Acclimation means leaving the flooring in the house until its moisture matches. It is done by meter readings. A fixed number of days proves nothing.
New concrete floor in a barn lower levelNear Boyertown · May 2026
A new concrete floor on our barn job near Boyertown. New concrete holds water for a long time, so a slab is tested before any finished flooring goes over it.

Squeaks

A squeak is wood moving against a nail or against another piece of wood. With the old flooring up, the subfloor is screwed down to every joist. This is the only moment it is easy, and it takes an hour.

Old houses add three things

  • Plank subfloors. Boards laid on the diagonal, with gaps. They usually get a layer of plywood over them before modern flooring.
  • Layers. Two or three old floors on top of each other are common. Each one raised the floor, and removing them changes heights at doors and stairs.
  • Old resilient flooring. Sheet flooring, nine-inch tiles and black adhesive from before the 1980s can contain asbestos. Have a sample tested before anyone sands or scrapes it.

Where subfloor work shows up in our proposals

Subfloor repairs belong in the written proposal, next to the flooring itself. See flooring services. If you have not chosen a material yet, read flooring room by room.

About this guide

General guidance from Pro Elite Builders, last reviewed on November 19, 2026. Every house is different, and product instructions and local codes take priority over anything written here.

    Questions

    Quick answers

    Do I need underlayment?

    It depends on the floor. Many vinyl planks have a pad attached and want nothing more. Nail-down hardwood goes over a paper or felt layer. Tile goes over backer board or an uncoupling membrane. Follow the maker's instructions.

    Can new flooring go over the old floor?

    Sometimes. The old floor has to be flat, sound and firmly attached, and the extra height has to work at doors, appliances and stairs.

    Can self-leveling compound be used on a wood subfloor?

    Yes, with the primer and reinforcement the product calls for. It adds weight and height, so it suits shallow dips.

    How long does hardwood need to acclimate?

    Until its moisture content is close to the subfloor's, measured with a meter. That can take a few days or a few weeks, depending on the season and the house.

    Keep reading

    Free estimate

    Have a project in mind? We'll come out and look at it.

    Tell Pro Elite Builders what you need done. We'll call you and come out to look at the job the same day or within 3 days, then send a written proposal with the scope, the price and the schedule.

    • On site the same day or within 3 days
    • Written proposals
    • PA HIC #PA215210

    Request a free estimate

    1. 1What do you need?
    2. 2Show us the job
    3. 3How do we reach you?

    What do you need?

    What do you need? Choose all that apply.

    or call us at (610) 858-5650

    CallFree estimate