What to Do After a House Fire: The First Week and the Order of Rebuilding

Water and fire damageBy Pro Elite Builders, PA HIC #PA215210Checked 3 min read

The short answer

Do not go back in until the fire department says it is safe. Then call your insurer, have the building secured against weather and entry, and document the damage before anything is thrown away.

The rebuilding follows in a fixed order: cleaning and drying, an assessment of the structure, permits, then repair from the framing outward.

The first week

  1. Wait for clearance. Floors and roofs can be weakened, and the air holds soot and gases. The fire department decides when you may enter.
  2. Call your insurer. Get a claim number and the adjuster's name. Ask whether your policy pays for temporary housing.
  3. Secure the house. Openings are boarded and holes in the roof are tarped. Insurers expect the owner to prevent further damage.
  4. Leave the utilities off. Gas, power and water stay off until each has been checked.
  5. Get the fire report. Ask the fire department how to obtain a copy. The insurer will want it.
  6. Document. Photograph every room. List damaged belongings. Do not discard anything until the adjuster has seen it or agreed.
  7. Recover essentials when allowed. Identification, medication, insurance papers, keys.
  8. Deal with the water. A house that was hosed down is soaked. Drying has to start quickly, for the reasons in our guide to the first 24 hours after a leak.

Who does what

PartyTheir part
Insurance adjusterDecides what the policy covers and writes the scope of loss
Cleaning and mitigation companyBoard-up, water extraction, drying, soot and smoke cleaning, contents
Structural engineerSays which framing can stay, where the structure burned
General contractorRemoves what cannot be saved and rebuilds the house
MunicipalityIssues the permits and inspects the repairs

Pro Elite Builders does the rebuilding: framing, roofing, drywall, floors, kitchens and baths. Soot and smoke cleaning is done first, by a cleaning specialist.

The order of rebuilding

  1. Cleaning, drying and removal of debris.
  2. Selective demolition, back to sound material.
  3. Structural repair: framing, floors, roof structure.
  4. Roofing, windows and doors, so the house is dry.
  5. Rough plumbing, wiring and heating.
  6. Inspections of the framing and rough work.
  7. Insulation and drywall.
  8. Floors, cabinets, trim and paint.

It is the same sequence as any large remodel, described in what order to renovate a house in.

Permits

Structural repairs after a fire need a building permit, and so do new wiring and plumbing. The inspector has to see the repaired framing and the rough work before the walls are closed. Starting those repairs without a permit can mean opening the walls again.

Estimates and the insurance scope

The adjuster writes a scope of loss, a list of what the insurer will pay to repair. A contractor's proposal should cover the same items, so the two can be compared line by line. Where the contractor finds damage the scope missed, it is documented with photos and sent to the adjuster as a supplement.

If you need the house rebuilt

We come out, look at the damage and send a written proposal with the scope, the price and the schedule. See fire damage restoration. For what happens to burned framing, read can fire-damaged framing be saved.

Sources

We read these on November 19, 2026. Rules, codes and local ordinances change, so confirm with your municipality before you rely on any of this.

Questions

Quick answers

Can we stay in the house after a fire?

Only if the fire department and the utilities say it is safe and the smoke damage is limited. After most fires that reach the structure, families live elsewhere during repairs.

Do I have to use the contractor my insurer recommends?

In general the choice of contractor is yours. Check your policy and ask the adjuster how payment works with a contractor you choose.

How long does rebuilding take?

It depends on the extent of the damage, how quickly the claim is settled and how long permits take. The written proposal gives the construction schedule.

Will the smoke smell go away?

It does when the source is removed: soot is cleaned off, smoke-soaked insulation and drywall are taken out, and the remaining framing is sealed. Covering the smell without doing that work does not last.

Keep reading

  • Roof framing opened up for repair, with new plywood beside old joists and a steel beamWest Earl Township · May 2026

    Water and fire damage

    Can fire-damaged framing be saved?

    Smoke-stained studs usually stay. Charred ones depend on how much sound wood is left under the char. Trusses, I-joists and wiring that saw real heat are replaced.

    3 min read

  • Plank roof deck with holes rotted through by long-running leaksWest Earl Township · May 2026

    Water and fire damage

    The first 24 hours after a water leak

    Stop the water, stay clear of electricity, photograph everything, then get the water out and air moving. Materials left wet for a day or two can grow mold.

    3 min read

Services, projects and towns this guide relates to

Free estimate

Have a project in mind? We'll come out and look at it.

Tell Pro Elite Builders what you need done. We'll call you and come out to look at the job the same day or within 3 days, then send a written proposal with the scope, the price and the schedule.

  • On site the same day or within 3 days
  • Written proposals
  • PA HIC #PA215210

Request a free estimate

  1. 1What do you need?
  2. 2Show us the job
  3. 3How do we reach you?

What do you need?

What do you need? Choose all that apply.

or call us at (610) 858-5650

CallFree estimate