Brick ranch in York Township with wood strapping installed over the old shingles for a metal roof

Metal Roof over Shingles in York Township, PA: Strapping a Brick Ranch

The old shingles stay. Wood strapping goes over them, and the metal panels fasten to the wood.

The job

What Pro Elite Builders did in York Township

A red brick ranch with a hip roof. Pro Elite Builders laid wood strapping across every roof plane, over the existing shingles, as the base for a new metal roof.

Hips and valleys got extra boards, and the porch gable was prepared along with the main roof. These photos show the house strapped and ready for panels, in March 2026. The detached garage on the same property was torn off to the deck instead.

More about roofing & repair
Work
Wood strapping over existing shingles as the base for metal roofing
Location
York Township, PA · York County
Building
Brick ranch with a hip roof
Date
March 2026
Stage
Photos through strapping
Contractor
Pro Elite Builders, PA HIC #PA215210
Wood strapping laid across old shingles with a wide board bed in the valley and a patch in the deckYork Township · March 2026

Worth a closer look

What the wood strips are for

The boards are called strapping, or purlins. They run across the roof over the old shingles, and the metal panels fasten to them.

Strapping gives the panels a straight, solid line to screw into. It bridges the bumps in the old shingles and leaves an air space under the metal.

Hips and valleys get extra boards, because that is where the trim and the valley metal fasten. In one spot on this roof the shingles are cut away to the wood, where the deck needed a patch.

Photo log

Preparing a roof for metal over shingles

Every photo was taken on this Pro Elite Builders job.

  1. Brick ranch with wood strapping over the old shingles

    01The whole roof strapped

    Every plane of the hip roof carries horizontal strapping, with boards doubled along the hips.

  2. Side view of a brick ranch with strapping on the roof and underlayment on the porch gable

    02From the side yard

    The same roof from the other side. The porch gable is under new underlayment.

  3. Strapping layout at a valley with a patched area of roof deck

    03The valley

    A wide bed of boards runs down the valley to carry the valley metal. To the right, a patch in the deck.

  4. Strapping over shingles seen from the roof ridge, with boards running down both hips

    04From the ridge

    Boards run down both hips from the ridge, and the strapping courses step down the roof between them.

Metal roofing

Metal roof over shingles: when it works

Going over the old roof is allowed and common. It suits some roofs and not others.

  • One layer only

    Building codes do not allow new roofing over a roof that already has two layers. A second layer of shingles under the metal means a tear-off.

  • A solid deck

    The old roof has to be dry and firm. Soft spots are cut out and repaired first. If the deck is bad in many places, the shingles come off.

  • Strapping

    Wood strapping gives the panels a straight fastening line and keeps them off the rough shingle surface, which can wear the back of a panel over the years.

  • What you give up

    Going over saves the labor and dump fees of a tear-off. You do not get to see the whole deck. On the detached garage at this property the roof was stripped to the plywood.

Scope

What this job included

  • Wood strapping across every roof plane
  • Extra boards along the hips and in the valleys
  • Deck opened and patched where it needed it
  • Porch gable prepared with the main roof

This list covers what our photos show. Your written proposal lists the full scope for your own job.

Services and guides behind this project

Reviews

What customers say about our roofing & repair work

5.0All reviews on Google
  • “Viktor and his crew were in and out got my roof changed in 1 day very clean and professional! 100% recommend”

    Yuri T.Roof replacement , Google review
  • “had them install a new roof on one of my rental units did a great job from start to finish will definitely be using them for other work i’ll need done”

    Sasha B.Roof on a rental , Google review
  • “They did my teepee roof with rubber, very professional, had shingles on before and problems with water getting in the building. The way the crew flashed in around the skylights turned out very nice and happy with it. Been a couple months now and having no issues with it at all. Thanks very much to you guys!”

    Timothy F.Rubber roof and skylights , Thumbtack review

Questions

Metal roof over shingles: questions homeowners ask

Can you install a metal roof over existing shingles?

Yes, when there is a single layer of shingles on a sound deck. The shingles stay in place under the metal. This York Township ranch was prepared that way.

Do you need furring strips under a metal roof over shingles?

Some panels can go straight over shingles on an underlayment. Strapping gives a flatter roof and a better fastening base, and it is what we used here. The panel maker's instructions decide what is allowed.

Is a metal roof over shingles cheaper than a tear-off?

It saves the tear-off labor and the disposal fees. The strapping adds lumber and time. Ask us to price it both ways on your roof.

Is a metal roof too heavy to go over shingles?

Metal roofing is light, lighter than a layer of asphalt shingles. Weight is rarely the limit. The condition of the deck and the number of layers already on the roof are.

Will there be condensation under the metal?

Warm, moist air from the house causes it. A ventilated attic and the right underlayment prevent it, and the air space that strapping creates helps. Ask us about your attic ventilation at the estimate.

When is a tear-off the better choice?

When there are two layers, when the roof has leaked, when the deck feels soft, or when you want to know for certain what is under the shingles.

More work

Other Pro Elite Builders projects

Free estimate

Have a project in mind? We'll come out and look at it.

Tell Pro Elite Builders what you need done. We'll call you and come out to look at the job the same day or within 3 days, then send a written proposal with the scope, the price and the schedule.

  • On site the same day or within 3 days
  • Written proposals
  • PA HIC #PA215210

Request a free estimate

  1. 1What do you need?
  2. 2Show us the job
  3. 3How do we reach you?

What do you need?

What do you need? Choose all that apply.

or call us at (610) 858-5650

CallFree estimate