The short answer
For home improvement work over $500, Pennsylvania law requires a written contract signed by you and the contractor. The law lists what it must contain, from the registration number to the start and completion dates.
On a job priced above $5,000, the deposit cannot exceed one-third of the price, plus the cost of special-order materials. You may cancel within three business days of signing, with no penalty. A contractor may not take any payment before the contract is signed.
Which jobs the law covers
The Home Improvement Consumer Protection Act covers repair, remodeling, replacement and installation work on a private residence when the total price is more than $500. It covers work on the land around the house as well, such as driveways, fences and decks. New home construction is outside it.
The 13 things a contract must contain
The Act says a home improvement contract is not valid or enforceable against the owner unless it meets this list. Hold your contract next to it:
- It is in writing, legible, and shows the contractor's registration number.
- It is signed by you and by the contractor or a salesperson.
- It contains the entire agreement, with copies of all required notices attached.
- It shows the date of the transaction.
- It gives the contractor's name, address and phone number. A post office box alone does not count as an address.
- It gives the approximate starting date and completion date.
- It describes the work, the materials and the specifications, which cannot change without a written change order signed by both sides.
- It states the total price, or sets out a time-and-materials arrangement with a written estimate.
- It lists the down payment and the cost of any special-order materials, each as a separate figure.
- It names the subcontractors known at signing, with addresses and phone numbers.
- It commits the contractor to carry at least $50,000 of personal injury coverage and $50,000 of property damage coverage, and states the coverage in force.
- It includes the Attorney General's toll-free number, 1-888-520-6680.
- It includes a notice of your right to cancel.
You are also entitled to a completed copy of the contract, free of charge, at the time you sign it.
How much deposit a contractor can ask for
For a contract with a total price above $5,000, the Act prohibits a deposit greater than one-third of the contract price, or one-third plus the cost of special-order materials named in the contract.
| Example | Contract price | Special-order materials | Largest lawful deposit |
|---|---|---|---|
| Roof replacement, stock materials | $12,000 | None | $4,000 |
| Remodel with custom windows | $12,000 | $3,000 | $7,000 |
Special-order materials are items made or ordered for your job that the supplier will not take back, such as custom windows or cabinets. The contract has to list their cost separately from the down payment, which lets you check the arithmetic.
The three-day right to cancel
You may rescind a home improvement contract without penalty within three business days of signing it. The law says this applies "regardless of where the contract was signed," so it covers a contract signed at the contractor's office as well as one signed at your kitchen table.
There is an exception for emergency work under a separate consumer protection law. The contract must carry a notice of the right, and the Attorney General's office says that notice has to be worded exactly as the law gives it.
Change orders and time-and-materials jobs
Once the contract is signed, the specifications cannot change without a written change order signed by you and the contractor. The Act separately prohibits deviating from the plans in any material way without a signed, dated change order that states the price change.
For work billed by time and materials, the contractor has to give you a written cost estimate before starting. The contract must state that estimate, and the cost may not rise more than 10% above it without a signed change order.
Clauses that let you void the contract
The Act lists clauses that make a home improvement contract voidable by the owner. Among them:
- a hold harmless clause;
- a waiver of health, safety or building code requirements;
- a confession of judgment clause;
- a waiver of your right to a jury trial;
- a provision awarding the contractor attorney fees and costs;
- a waiver of any right the Act gives you.
If the work never starts
The Act requires a refund within ten days of a written request sent by certified mail when two things are true: no substantial part of the work has been done, and more than 45 days have passed since the starting date in the contract.
What this means when you hire us
Pro Elite Builders puts the scope, the price and the schedule on paper before work starts. Use the list above to check any contract you are handed, ours included. To check a contractor's registration first, read how to verify a PA HIC number.
This article is general information about Pennsylvania law and not legal advice. For a dispute or a contract question, talk to an attorney or the Bureau of Consumer Protection.